Testimonials

“Their attention to the completion goals, scheduling, flexibility to our contracting strategy and their ability to respond quickly to work requirements were a key component to making this project a success for everyone involved” – Jim Maddocks, P. Eng., PMP, Gas Liquids Engineering, Tupper West Sour Gas Plant

“TAHK demonstrated innovativeness and offered invaluable input to Petrogas in resolving issues that occurred during the construction phase. Throughout the entire project TAHK showed initiative and conducted themselves in a very ethical and professional manner. TAHK’s execution of the project resulted in no lost time accidents during the construction period.” – John Pysklywec, Project Manager, Petrogas Inc.

“TAHK provided construction services from January 2008 to June 2009 as part of a construction team (Mechanical, Electrical, Instrumentation, Inspection, and QA/QC) that completed 350,000 site man hours without a major incident.” – Jim Poulson, P.Eng., Project Manager, Grantech International

“TAHK Projects LTD was responsible for all the piping, tank installation, structural steel, civil work and more. Both the craftsmanship and professionalism demonstrated by TAHK Projects Ltd. on the Murphy Oil Tupper Gas Plant project was excellent especially during a time when manpower and equipment were very difficult to come by. Each and every one of the over one hundred on-site employees at peak times, were professional, hard working and dedicated to doing the job right with safety always being the priority.” – Darcy Oberlin, Senior Construction Manager, Murphy Oil Construction