Compressor & Pump Station(s) Projects

relocation of a Compressor and Dehydration Station from Fort Nelson, BC to Fort St. John, BC

  • General Mechanical Contractor
  • Structural upgrades to modularize off-module piping in Fort Nelson, to make piping and structural steel suitable for transportation as assembled modules
  • Disassembly of all interconnect piping between equipment and piping modules
  • Unload and setting of same equipment at Fort St. John site
  • Fabrication, assembly and installation of 6 new modules