Steam Assisted Gravity Drainage (SAGD) Projects

Demonstration SAGD Facility constructed near Wabasca, AB

  • Mechanical Contractor
  • Cut and Cap 1965 piles
  • Installation of underground fiberglass piping
  • Construction of 6 double well pads
  • 10,000 DI fabricated off-site
  • Module interconnects and lines to flare stack
  • Tank farm and vessel interconnect piping